I’ve been waiting on the hardtail to come in so in the meantime I stripped, and degreased the engine and transmission. Overall the engine was in good condition and although the pistons had seen better days th just may just get away with a hone. The crank and jugs are now off to the machine shop and the cases, covers and heads will be soda blasted in house ready for the rebuild.
![You are currently viewing Triumph Bonneville Project Update](https://speeddeluxe.com/wp-content/uploads/2014/07/AJS_7059.jpg)
Engine is cleaned and ready to be assessed